| Scale: HO | Era: 1994ish | Size: 20′ x 30′ |
| Track Comp: 60% | Scenery: 30% | Mainline Length: 100′ |
| Controls: NCE | ADA: N | Basement Stairs: Y |
Description of Layout:
3 Level cantilever on 3 walls with overhead support for connecting the loop. A Helix provides access from lower level staging to middle level switching puzzle, and up to the third level which is strictly rural.
I have a You Tube channel @Mr.trackcleaner903
You can see some of the Upper Layout as I demonstrate my Track Cleaning Line.
I now have the Middle Level Bench work Completed
Days Available: Thursday 10/8___Y______
Friday 10/9 __Y_____
Saturday 10/10 __Y____





