| Scale: HO | Era: 1979 | Size: 34′ x 24′ |
| Track Comp: 100% | Scenery: 5% | Mainline Length: 220′ |
| Controls: NCE Dead Rail | ADA: N | Basement Stairs: Y |
Description of Layout:
Welcome to the Chessie System in West Michigan! My railroad centers around operations in Wyoming Yard. I model From Grand Rapids Mi. to Holland Mi. in 1979. I include the Ludington branch to “Fuller Junction” and the Muskegon Branch to the West Olive power plant. The railroad is set up as a point to point multi-level layout. I use CMRI but the system is currently not in operation. I am in the planning process of a major rebuild and realignment of the railroad that corrects things that have been “bothering me” about the design.
Days Available: Thursday 10/8_________
Friday 10/9 _______
Saturday 10/10 ______



